Today was my first day as a network intern. I started by cleaning out the data closet in Bryan Jr. The data closet contained a couple switches that were no longer being used since they were designed for ethernet connection and the building has been updated to wireless connections. I removed the switches and the extra ethernet cables. Afterwards, I installed shorter patch cables for the remaining switch after I moved it closer .
5.5 Hours

Here is a picture of the closet before.


Here is a picture of the closet after.


5 Hours