Tuesday, May 22, 2012

Today Alex and I worked on the closet in King 121. We rerouted the cables and installed an APC.
Once installed we connected it to the UPS and powered the switches through it. Afterwards I confirmed that the switches had been placed in web helpdesk.




King 121 Before


 King 121 After


7 Hours


4 comments:

  1. This comment has been removed by the author.

    ReplyDelete
  2. Good job, though you should fix this sentence:
    "we plugged the switches into it and it into the UPS."

    ReplyDelete