Today John has been with me most of the day and we have visited several closets. I finally finished the closet on the 3rd floor of Frank. Then I went to Hendrix and cleaned that closet. At this point John joined me and we went to Dana and we found that closet under the building and cleaned it. Next we went to Hege Cox where the switch was mounted side ways to fit it in a closet that was only 6 inches deep. We were unable to improve that closet but we did get it inventoried. Next we went to the North Apartments the switches there were mounted on a piece of plywood sideways. We were unable to improve those closets but did inventory all of the switches in the six buildings. Once this was done we came back to Bauman and updated web help desk and share point.

Frank 318 Before


Frank 318 After


Hendrix Before


Hendrix After


Dana Before


Dana After


The Shallow Closet in Hege Cox


8.25 Hours