Today I am catching up on paper work from what I did on Thursday of last week. To start with John and I and later joined by Alex cleaned out the closet in Milner Hall. This one was not to bad it had several 3Com switches that needed to be removed since that dorm was now totally wireless. We traced down all of the cables from the switches to the patch panel and removed them first and followed by removing the switches. Once that was completed we moved on switch up level with the patch panel it was connected to and rerouted all of the cables. Unfortunately we did not have any extra cables channels that would hide the cables like in the other closets so they are exposed here. However it still looks neat. Once that was done we inventoried the equipment so it could b put in web help desk. We also went back to the library to take pictures of the APC for Merritt to determine if they had any errors or not. Then we went to Alumni Gym, Archdale, and Bryan Hall to inventory closets that had already been cleaned in the past.

Milner Before


Milner After


Library Lower APC
 Notice it is off


Library 1st floor APC
Notice one light is red an error is detected


Library 2nd floor APC
No red lights working properly


7 Hours

2 comments: