August 23rd
Brian and I went to the bookstore we ran the cable from the port on the wall up the wall and into the ceiling. We then installed the wireless access port in the drop ceiling. After that I worked on the net work map.
7
August 24th
Teresa and I went out to move the wireless access point that the student in Bryan Hall had complained about. It was located too close to the wall and Brian told me that sometimes if an access point is to close to a wall it blocks the signal. Once we moved the access point the students were able to connect to it.
After that I worked more on the network map.
6
August 28th
Today i mostly worked on the network map. However, about mid day Brian asked me to perform a Dell chat to get 4 computers covered under the factory warranty. I chatted with Dell and got them to ship the parts to us.
7